About this Document
3
Table of Contents
5
1 Precautions for Power-On Commissioning
7
2 Basic Rules for Power-On Commissioning
8
3 General Power-On Commissioning Process
9
4 Preparations for Power-On Commissioning
10
Tool Preparations
10
Obtaining Technical Documents
11
Commissioning Personnel Skill Requirements
13
Preparing for the Power Supply and Distribution System Power-On Commissioning
14
Preparing for the Cooling System Power-On Commissioning
15
Preparation Process
15
Material Preparations for the Secondary Refrigerant
15
Configuring Cooling Components
19
Verifying the Setting of the Automatic Water Refill Valve
22
Switching Valves for Filling Secondary Refrigerant
24
Filling Secondary Refrigerant
25
Expelling Air from the Cooling System
27
Expelling Air from the Expansion Tanks
27
Expelling Air from the LCU
29
Expelling Air from Chillers
30
Switching Valves to the Operating State
34
Preparing for the Management System Power-On Commissioning
35
Preparing for the Fire Extinguishing System Power-On Commissioning
35
Optional) Auxiliary Heating for Extra Low Temperatures
36
5 Items to be Checked before Power-On
38
6 Power-On Commissioning
42
General Power-On Commissioning Process
42
Power-On Commissioning
43
Normal Power-On Checking for Components
44
7 System Commissioning
50
Power Supply and Distribution System Commissioning
50
Verifying the Switchover between Two Power Supplies
50
Commissioning the Logic Load Disconnection (Powering-Off) of the Power Supply System under Normal Temperature
51
Commissioning the Cooling System
52
Commissioning the Management System
52
Commissioning the Fire Extinguishing System (Standard)
53
Fire Extinguishing System Commissioning (CE)
64
8 Shutting down and Powering off
72
9 Commissioning Core Components
74
Commissioning Power Distribution Components
74
Commissioning the Power Distribution Cabinet
74
Optional) Commissioning the 8D ATS
75
Optional) Commissioning the PD510 Electricity Meter
76
Optional) Commissioning the MDU
80
Commissioning the UPS5000-E
83
Optional) Commissioning the UPS2000-G
84
Commissioning Cooling Components
85
Commissioning Chillers
85
Commissioning 30 Kw Chilled Water Precision Air Conditioners
86
Initial DIP Switch Configuration for T/H Sensors
88
Initial DIP Configuration for the Main Control Board
89
Teamwork Initial Configuration
90
Initial Configuration of Temperature and Humidity
97
Optional) Commissioning Civil Air Conditioners
99
Commissioning Monitoring Components
100
Commissioning Access Control Components
100
Optional) Registering a Fingerprint Scanner User
101
Initial Configurations for the Management System
102
Commissioning Fire Extinguishing Devices (Standard)
103
Commissioning the Fire Alarm Control Panel (Standard)
103
Commissioning the Emergency Lights (Standard)
105
Commissioning Fire Extinguishing Devices (CE)
106
Commissioning the Extinguishant Control Panel (CE)
106
Commissioning the Emergency Light (CE)
107
Commissioning the VESDA
108
10 Acronyms and Abbreviations
110
Advertisement
Advertisement
Related Products
Huawei FusionModule500
Huawei FusionModule2000 V500R002C03
Huawei FusionModule1000A20
Huawei FusionModule1000A
Huawei FusionModule2000-S
Huawei FusionModule500-SU61A12S
Huawei FusionDC1000B
Huawei FusionModule2000 V500R003C10
Huawei FusionModule1000A40 ICT Solution
Huawei FusionModule800
Huawei Categories
Cell Phone
Network Router
Wireless Router
Modem
Inverter
More Huawei Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL