Air-conditioners for building application indoor unit (52 pages)
Summary of Contents for Mitsubishi Electric CITY MULTI PLFY-P NAMU-E Series
Page 1
Air-Conditioners For Building Application INDOOR UNIT PLFY-P·NAMU-E INSTALLATION MANUAL For safe and correct use, please read this installation manual thoroughly before installing the air-conditioner unit.
Page 2
• The terminal block cover panel of the unit must be firmly attached. rectly installed unit may fall down and cause damage or injuries. • Use only accessories authorized by Mitsubishi Electric and ask a dealer or • The unit must be securely installed on a structure that can sustain its weight.
Page 3
2. Installation location Refer to the outdoor unit installation manual. 3. Installing the indoor unit 3.1. Check the indoor unit accessories (Fig. 3-1) The indoor unit should be supplied with the following accessories. Accessory name Q’ty Installation template Washers (with insulation) Washers (without insulation) Pipe cover (for refrigerant piping joint) Small diameter...
Page 4
3. Installing the indoor unit 3.4. Branch duct hole and fresh air intake hole (Fig. 3-4) in. (mm) At the time of installation, use the duct holes (cut out) located at the positions shown in following diagram, as and when required. •...
Page 5
4. Installing the refrigerant piping 4.1. Precautions 4.1.1. For devices that use R22 refrigerant • Use the refrigeration oil applied to the flared sections. • Use C1220 copper phosphorus, for copper and copper alloy seamless pipes, to connect the refrigerant pipes. Use refrigerant pipes with the thicknesses specified in the table to the below.
Page 6
4. Installing the refrigerant piping A Refrigerant pipe and insulating ma- 4.3. Indoor unit (Fig. 4-3) terial Heat insulation for refrigerant pipes: B Pipe cover (large) 1 Wrap the enclosed large-sized pipe cover around the gas pipe, making sure that C Pipe cover (small) the end of the pipe cover touches the side of the unit.
Page 7
6. Electrical work A Switch 15 A 6.1. Power supply wiring (Fig. 6-1) B Overcurrent protection 15 A Power cable size (diameter) : more than 1.6 mm (AWG14) C Indoor unit Ground cable size (diameter) : 1.6 mm (AWG14) D Total operating current be less than 15 A * Use copper supply wires.
Page 8
6. Electrical work 6.3. Wiring connection (Fig. 6-5) 1. Remove the holder and intake sensor. 2. Remove two service panels. 3. Wire the power cable and control cable separately through the respective wiring entries given in the diagram. • Do not allow slackening of the terminal screws •...
Page 9
6. Electrical work 6.7. Remote controller in. (mm) 1) Installing procedures (1) Select an installing position for the remote controller. (Fig. 6-7) The temperature sensors are located on both remote controller and indoor unit. 1-3/16 1-3/16 s Procure the following parts locally: (30) (30) Two piece switch box...
Page 10
7. Test run 7.3. Check of drainage (Fig. 7-2) • During the test run, ensure the water is being properly drained out and that no water is leaking from joints. • Always check this during installation even if the unit is not required to provide cool- ing/drying at that time.
Page 11
8. Installing the grille 8.3. Selection of the air outlets 4-directional 3-directional For this grille the discharge direction is available in 11 patterns. Also, by setting the One pattern: 4 patterns: Remote controller to the appropriate settings, you can adjust the air-flow and speed. Factory setting One air outlet fully closed Select the required settings from the Table according to the location in which you...
Page 12
8. Installing the grille 8.5. Locking the up/down airflow direction (Fig. 8-9) The vanes of the unit can be set and locked in up or down orientations depending upon the environment of use. • Set according to the preference of the customer. The operation of the fixed up/down vanes and all automatic controls cannot be performed using the remote controller.
Page 16
This product is designed and intended for use in the residential, commercial and light-industrial environment. Please be sure to put the contact address/telephone number on this manual before handing it to the customer. HEAD OFFICE: MITSUBISHI DENKI BLDG., 2-2-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN Printed in Japan BG79U666H01...