All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope.
Installation Guide About This Document About This Document Purpose This document describes the procedures for installing the DBS3900 devices on the Indoor Centralized Rack (ICR). Product Version The following table lists the product versions related to this document. Product Name...
Page 6
This chapter describes the procedure for installing all the cables. 16 Checklist for the DBS3900 Hardware Installation This section describes the checklist for the DBS3900 hardware installation. 17 Performing the DBS3900 Power-On Check After all devices are installed, you need to check the power-on status of the BBU and RRU.
DBS3900(ICR) Installation Guide Contents Contents About This Document........................iii 1 Changes in the DBS3900 (ICR) Installation Guide.............1-1 2 Installation Preparations......................2-1 2.1 Making Documents Available.........................2-2 2.2 Tools and Instruments.............................2-2 2.3 Skills and Requirements for Onsite Personnel....................2-3 3 Information About the Installation..................3-1 3.1 Overview of Devices............................3-2 3.2 Installation Options............................3-5...
Page 12
15.11 Installing the CPRI Optical Cable......................15-61 15.12 Installing the Antenna Jumper for the RRU....................15-64 15.13 Installing a GPS Clock Signal Cable.......................15-67 16 Checklist for the DBS3900 Hardware Installation............16-1 17 Performing the DBS3900 Power-On Check..............17-1 Huawei Proprietary and Confidential Issue 01 (2011-03-30)
DBS3900(ICR) Installation Guide 1 Changes in the DBS3900 (ICR) Installation Guide Changes in the DBS3900 (ICR) Installation Guide 01 (2011-03-30) This is the first official release. Compared with Draft A (2011-01-30), no content is changed. Compared with Draft A (2011-01-30), no content is added.
This chapter describes the tools and instruments required for installation and the skills and prerequisites required for onsite installation engineers. 2.1 Making Documents Available Before installing the DBS3900, obtain related information from the following document: 2.2 Tools and Instruments This section describes the tools and instruments required for installation.
DBS3900(ICR) 2 Installation Preparations Installation Guide 2.1 Making Documents Available Before installing the DBS3900, obtain related information from the following document: Installation Reference BBU3900 Hardware Description BBU3900 Hardware Maintenance Guide 2.2 Tools and Instruments This section describes the tools and instruments required for installation.
Before the installation, pay attention to the following items: The customer's technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. The number of onsite personnel depends on the engineering schedule and installation environment.
This chapter describes the information about the installation, including exterior, installation scenario, and space requirements 3.1 Overview of Devices This chapter describes the devices involved in the installation of the DBS3900. 3.2 Installation Options The installation options vary according to height-restricted and height-unrestricted scenarios.
3.1 Overview of Devices This chapter describes the devices involved in the installation of the DBS3900. IFS06 The IFS06 is an Indoor Floor Installation Support (IFS). It is used for installing DBS3900 devices in a centralized manner. (1) Cable rack...
The IFS06 is an indoor floor installation support. The IMB03 is an indoor mini box. 3.2.1 Height-Restricted Scenario This section describes the installation of the DBS3900 on the ICR in the height-restricted scenario. 3.2.2 Height-Unrestricted Scenario This section describes the installation of the DBS3900 on the ICR in the height-unrestricted scenario.
Figure 3-17 Installation of the DC RRUs on the IFS06 3.2.2 Height-Unrestricted Scenario This section describes the installation of the DBS3900 on the ICR in the height-unrestricted scenario. In the scenario where a cable rack is more than 2 m above the floor (hereinafter referred to as...
The total number does not tally with the Find out the cause and report any missing packing list articles to the local Huawei office. Step 2 Check the exterior of the packing case. If ... Then ... The outer packing is intact...
16 Checklist for the DBS3900 Hardware Installation Checklist for the DBS3900 Hardware Installation This section describes the checklist for the DBS3900 hardware installation. Table 16-1 Hardware installation checklist Item The position for each equipment conforms to the engineering design and meets the space requirement.
Page 200
DBS3900(ICR) 16 Checklist for the DBS3900 Hardware Installation Installation Guide Item The distance between the bundled fiber and the BBU panel is between 40 mm and 70 mm. Labels are correct, legible, and complete on both ends of each cable.
After all devices are installed, you need to check the power-on status of the BBU and RRU. CAUTION The DBS3900 must be powered on within seven days after it is unpacked, and the period for which the DBS3900 remains powered-off during maintenance must not exceed 48 hours.